{"requirement_id":"JDDG25-14.11.10.12-G01","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.11.10.12","title":"FREQUENCY CONVERTERS","page_printed":267,"page_pdf":297,"fact":"Frequency converters are typically used to supply 400 Hz power to aircraft and associated maintenance and test equipment.","modality":"descriptive","strength":"guidance"},"localization_ja":{"language":"ja","title_ja":"周波数変換器","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"～である／～を示す","strength_label_ja":"指針","translation_priority":"low","translation_notes":[],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":[],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"normal"},"applicability":{"applicability_class":"informational","evaluation_mode":"not_applicable","evaluation_scope":"project","input_semantics":"none","source_condition_text":null,"trigger":null,"approval_gate":null,"exception_condition":null,"condition_provenance":"not_applicable","normalization_provenance":"not_applicable"},"lifecycle":{"primary_phase":"operations_maintenance","primary_phase_label":"Operations / Maintenance / Modification","applicable_phases":["commissioning","operations_maintenance"],"phase_links":[{"phase":"commissioning","provenance":"editorial_derived","basis":"Normalized from verification stage `commissioning`.","phase_label":"Testing / Commissioning / Acceptance"},{"phase":"operations_maintenance","provenance":"source_explicit","basis":"Source explicitly addresses maintenance, replacement, periodic access, or later modification.","phase_label":"Operations / Maintenance / Modification"}]},"responsibility":{"primary_workflow_owner":"ACT-WORKFLOW-VERIFICATION-PARTY","primary_workflow_owner_name":"Verification / Testing Party (Workflow Placeholder)","actor_assignment_status":"workflow_only","actors":[{"actor_id":"ACT-WORKFLOW-VERIFICATION-PARTY","actor_name":"Verification / Testing Party (Workflow Placeholder)","actor_class":"workflow_placeholder","source_named":false,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"commissioning","lifecycle_phase_label":"Testing / Commissioning / Acceptance","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."},{"actor_id":"ACT-WORKFLOW-OM-PARTY","actor_name":"Operations / Maintenance Party (Workflow Placeholder)","actor_class":"workflow_placeholder","source_named":false,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"operations_maintenance","lifecycle_phase_label":"Operations / Maintenance / Modification","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."}]},"verification":{"method":null,"stage":["commissioning","operations_maintenance"],"acceptance_criteria":null,"evidence_required":[],"verification_provenance":"not_applicable","evidence_provenance":"not_applicable","audit_status":"informational_or_guidance","audit_confidence":"high","acceptance_provenance":"not_applicable","evidence_type_ids":[],"supporting_source_requirements":[],"source_support_scope":"same_requirement_or_none"},"resolved_evidence":[],"supporting_source_requirements":[],"references_resolved":[]}