{"requirement_id":"JDDG25-14.11.13.3-R01","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.11.13.3","title":"ELECTRONIC MONITORING SYSTEM","page_printed":269,"page_pdf":299,"fact":"Monitoring requirements for fire alarm, smoke control, and other special systems are to be coordinated with other designers as required.","modality":"imperative","strength":"conditional_mandatory"},"localization_ja":{"language":"ja","title_ja":"電子監視システム","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"条件を満たす場合は～すること","strength_label_ja":"条件付き必須","translation_priority":"high","translation_notes":[],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":[],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"normal"},"applicability":{"applicability_class":"conditional_machine","evaluation_mode":"machine","evaluation_scope":"project","input_semantics":"engineering_coordination_determination","source_condition_text":"Monitoring requirements for fire alarm, smoke control, and other special systems are to be coordinated with other designers as required.","trigger":{"field":"design_determinations.fire_monitoring_coordination_required","op":"is_true"},"approval_gate":null,"exception_condition":null,"condition_provenance":"source_explicit","normalization_provenance":"editorial_normalization"},"lifecycle":{"primary_phase":"design","primary_phase_label":"Design","applicable_phases":["design"],"phase_links":[{"phase":"design","provenance":"source_explicit","basis":"Source explicitly assigns a designer/design-document action.","phase_label":"Design"}]},"responsibility":{"primary_workflow_owner":"ACT-DESIGNER-AE","primary_workflow_owner_name":"Designer / A-E","actor_assignment_status":"source_actor_present","actors":[{"actor_id":"ACT-DESIGNER-AE","actor_name":"Designer / A-E","actor_class":"project_delivery","source_named":true,"relation_type":"action_owner","provenance":"source_explicit","lifecycle_phase":"design","lifecycle_phase_label":"Design","basis":"Source explicitly names the designer/electrical designer."}]},"verification":{"method":"design_and_installation_conformance_review","stage":["design"],"acceptance_criteria":null,"evidence_required":["design_document_or_installed_condition"],"verification_provenance":"editorial_derived","evidence_provenance":"jddg_cross_section_explicit","audit_status":"derived_check_method_not_stated_by_source","audit_confidence":"medium","acceptance_provenance":"not_stated_in_jddg","evidence_type_ids":["EV-DESIGN-ANALYSIS-FINAL"],"supporting_source_requirements":["JDDG25-14.8.4.3-R01"],"source_support_scope":"design_submittal_or_analysis"},"resolved_evidence":[{"evidence_type_id":"EV-DESIGN-ANALYSIS-FINAL","name":"Final Design Analysis compliance verification","source_requirement_ids":["JDDG25-14.8.4.3-R01"],"stage":["final_design"],"source_scope":"Final Design Analysis should support and verify design compliance with project requirements."}],"supporting_source_requirements":[{"requirement_id":"JDDG25-14.8.4.3-R01","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"Final design analysis should support and verify that the design complies with project requirements."}],"references_resolved":[]}