{"requirement_id":"JDDG25-14.11.16-R01","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.11.16","title":"LUMINAIRE SELECTION","page_printed":270,"page_pdf":300,"fact":"Lighting fixtures shall not be required to be Energy Star qualified.","modality":"shall_not_be_required","strength":"not_required"},"localization_ja":{"language":"ja","title_ja":"照明器具選定","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"～は要求されない","strength_label_ja":"要求なし","translation_priority":"medium","translation_notes":[],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":[],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"normal"},"applicability":{"applicability_class":"general","evaluation_mode":"default_applicable","evaluation_scope":"project","input_semantics":"none","source_condition_text":null,"trigger":null,"approval_gate":null,"exception_condition":null,"condition_provenance":"none","normalization_provenance":"none"},"lifecycle":{"primary_phase":"design","primary_phase_label":"Design","applicable_phases":["design"],"phase_links":[{"phase":"design","provenance":"jddg_cross_section_explicit","basis":"Linked to separate JDDG Section 14.8 design evidence/submittal requirements.","phase_label":"Design"}]},"responsibility":{"primary_workflow_owner":"ACT-DESIGNER-AE","primary_workflow_owner_name":"Designer / A-E","actor_assignment_status":"workflow_only","actors":[{"actor_id":"ACT-DESIGNER-AE","actor_name":"Designer / A-E","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"design","lifecycle_phase_label":"Design","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."}]},"verification":{"method":null,"stage":[],"acceptance_criteria":null,"evidence_required":[],"verification_provenance":"not_stated","evidence_provenance":"not_stated","audit_status":"no_verification_assigned","audit_confidence":"low","acceptance_provenance":"not_applicable","evidence_type_ids":["EV-LIGHTING-CALC","EV-FINAL-SCHEDULES","EV-FINAL-CALCULATIONS"],"supporting_source_requirements":["JDDG25-14.8.3.3-R04","JDDG25-14.8.4.1-R02","JDDG25-14.8.4.3-R02"],"source_support_scope":"design_submittal_or_analysis"},"resolved_evidence":[{"evidence_type_id":"EV-LIGHTING-CALC","name":"Lighting / lightning-risk / lighting-energy calculations","source_requirement_ids":["JDDG25-14.8.3.3-R04"],"stage":["intermediate_design"],"source_scope":"Intermediate calculations include point-to-point lighting, lightning risk, and lighting-energy calculations."},{"evidence_type_id":"EV-FINAL-SCHEDULES","name":"Final circuiting and schedules","source_requirement_ids":["JDDG25-14.8.4.1-R02"],"stage":["final_design"],"source_scope":"Final design completes circuiting, panel schedules, and lighting schedules."},{"evidence_type_id":"EV-FINAL-CALCULATIONS","name":"Final engineering calculations","source_requirement_ids":["JDDG25-14.8.4.3-R02"],"stage":["final_design"],"source_scope":"All final calculations are included in the Final Design Analysis."}],"supporting_source_requirements":[{"requirement_id":"JDDG25-14.8.3.3-R04","section":"14.8.3.3","title":"DESIGN ANALYSIS","fact":"Intermediate calculations should include point-to-point lighting calculations, lightning-protection risk analysis, and ASHRAE 90.1 lighting-energy calculations."},{"requirement_id":"JDDG25-14.8.4.1-R02","section":"14.8.4.1","title":"DRAWINGS","fact":"Final design is to complete all circuiting and all schedules, including panel and lighting schedules."},{"requirement_id":"JDDG25-14.8.4.3-R02","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"All final calculations are to be included in the Final Design Analysis."}],"references_resolved":[]}