{"requirement_id":"JDDG25-14.5.2-R03","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.5.2","title":"REUSE OF EXISTING EQUIPMENT AND MATERIALS","page_printed":233,"page_pdf":263,"fact":"Fluorescent and HID fixtures may be removed and reinstalled after cleaning and relamping when they are in good condition and energy-efficient.","modality":"may","strength":"conditional_permission"},"localization_ja":{"language":"ja","title_ja":"既設機器・材料の再使用","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"条件を満たす場合は～してよい","strength_label_ja":"条件付き許可","translation_priority":"medium","translation_notes":[],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":[],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"normal"},"applicability":{"applicability_class":"conditional_text","evaluation_mode":"human_review","evaluation_scope":"project","input_semantics":"human_review","source_condition_text":"they are in good condition and energy-efficient","trigger":null,"approval_gate":null,"exception_condition":null,"condition_provenance":"source_explicit","normalization_provenance":"text_only"},"lifecycle":{"primary_phase":"design","primary_phase_label":"Design","applicable_phases":["design","installation"],"phase_links":[{"phase":"design","provenance":"jddg_cross_section_explicit","basis":"Linked to separate JDDG Section 14.8 design evidence/submittal requirements.","phase_label":"Design"},{"phase":"installation","provenance":"source_implied","basis":"Source requirement concerns installed configuration or physical construction.","phase_label":"Installation / Construction"}]},"responsibility":{"primary_workflow_owner":"ACT-DESIGNER-AE","primary_workflow_owner_name":"Designer / A-E","actor_assignment_status":"workflow_only","actors":[{"actor_id":"ACT-DESIGNER-AE","actor_name":"Designer / A-E","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"design","lifecycle_phase_label":"Design","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."},{"actor_id":"ACT-CONSTRUCTION-CONTRACTOR","actor_name":"Construction Contractor","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"installation","lifecycle_phase_label":"Installation / Construction","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."}]},"verification":{"method":"design_and_installation_conformance_review","stage":["installation"],"acceptance_criteria":null,"evidence_required":["design_document_or_installed_condition"],"verification_provenance":"editorial_derived","evidence_provenance":"jddg_cross_section_explicit","audit_status":"derived_check_method_not_stated_by_source","audit_confidence":"medium","acceptance_provenance":"not_stated_in_jddg","evidence_type_ids":["EV-DESIGN-ANALYSIS-FINAL","EV-LIGHTING-CALC","EV-FINAL-SCHEDULES","EV-FINAL-CALCULATIONS"],"supporting_source_requirements":["JDDG25-14.8.4.3-R01","JDDG25-14.8.3.3-R04","JDDG25-14.8.4.1-R02","JDDG25-14.8.4.3-R02"],"source_support_scope":"design_submittal_or_analysis"},"resolved_evidence":[{"evidence_type_id":"EV-DESIGN-ANALYSIS-FINAL","name":"Final Design Analysis compliance verification","source_requirement_ids":["JDDG25-14.8.4.3-R01"],"stage":["final_design"],"source_scope":"Final Design Analysis should support and verify design compliance with project requirements."},{"evidence_type_id":"EV-LIGHTING-CALC","name":"Lighting / lightning-risk / lighting-energy calculations","source_requirement_ids":["JDDG25-14.8.3.3-R04"],"stage":["intermediate_design"],"source_scope":"Intermediate calculations include point-to-point lighting, lightning risk, and lighting-energy calculations."},{"evidence_type_id":"EV-FINAL-SCHEDULES","name":"Final circuiting and schedules","source_requirement_ids":["JDDG25-14.8.4.1-R02"],"stage":["final_design"],"source_scope":"Final design completes circuiting, panel schedules, and lighting schedules."},{"evidence_type_id":"EV-FINAL-CALCULATIONS","name":"Final engineering calculations","source_requirement_ids":["JDDG25-14.8.4.3-R02"],"stage":["final_design"],"source_scope":"All final calculations are included in the Final Design Analysis."}],"supporting_source_requirements":[{"requirement_id":"JDDG25-14.8.4.3-R01","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"Final design analysis should support and verify that the design complies with project requirements."},{"requirement_id":"JDDG25-14.8.3.3-R04","section":"14.8.3.3","title":"DESIGN ANALYSIS","fact":"Intermediate calculations should include point-to-point lighting calculations, lightning-protection risk analysis, and ASHRAE 90.1 lighting-energy calculations."},{"requirement_id":"JDDG25-14.8.4.1-R02","section":"14.8.4.1","title":"DRAWINGS","fact":"Final design is to complete all circuiting and all schedules, including panel and lighting schedules."},{"requirement_id":"JDDG25-14.8.4.3-R02","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"All final calculations are to be included in the Final Design Analysis."}],"references_resolved":[]}