{"requirement_id":"JDDG25-14.6.1-G01","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.6.1","title":"DAMP OR WET LOCATIONS","page_printed":234,"page_pdf":264,"fact":"The source distinguishes equipment rated for wet location only with a closed cover from equipment rated for energized active use with a plug inserted.","modality":"descriptive","strength":"guidance"},"localization_ja":{"language":"ja","title_ja":"湿潤場所または水気のある場所","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"～である／～を示す","strength_label_ja":"指針","translation_priority":"low","translation_notes":[],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":[],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"normal"},"applicability":{"applicability_class":"informational","evaluation_mode":"not_applicable","evaluation_scope":"project","input_semantics":"none","source_condition_text":null,"trigger":null,"approval_gate":null,"exception_condition":null,"condition_provenance":"not_applicable","normalization_provenance":"not_applicable"},"lifecycle":{"primary_phase":"installation","primary_phase_label":"Installation / Construction","applicable_phases":["installation"],"phase_links":[{"phase":"installation","provenance":"source_implied","basis":"Source requirement concerns installed configuration or physical construction.","phase_label":"Installation / Construction"}]},"responsibility":{"primary_workflow_owner":"ACT-CONSTRUCTION-CONTRACTOR","primary_workflow_owner_name":"Construction Contractor","actor_assignment_status":"workflow_only","actors":[{"actor_id":"ACT-CONSTRUCTION-CONTRACTOR","actor_name":"Construction Contractor","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"installation","lifecycle_phase_label":"Installation / Construction","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."}]},"verification":{"method":null,"stage":["installation"],"acceptance_criteria":null,"evidence_required":[],"verification_provenance":"not_applicable","evidence_provenance":"not_applicable","audit_status":"informational_or_guidance","audit_confidence":"high","acceptance_provenance":"not_applicable","evidence_type_ids":[],"supporting_source_requirements":[],"source_support_scope":"same_requirement_or_none"},"resolved_evidence":[],"supporting_source_requirements":[],"references_resolved":[]}