{"requirement_id":"JDDG25-14.6.4-R01","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.6.4","title":"FROST DEPTH","page_printed":235,"page_pdf":265,"fact":"Frost penetration values in UFC 3-301-01 should normally be used for design where frost depth is relevant.","modality":"should","strength":"recommended"},"localization_ja":{"language":"ja","title_ja":"凍結深度","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"～することが望ましい／～を推奨する","strength_label_ja":"推奨","translation_priority":"medium","translation_notes":["Canonical quality flag: cross_reference_required。日本語化で原典上の問題を解消したことにしない。"],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":["UFC 3-301-01"],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"cross_reference_required"},"applicability":{"applicability_class":"conditional_text","evaluation_mode":"human_review","evaluation_scope":"project","input_semantics":"human_review","source_condition_text":"Frost penetration values in UFC 3-301-01 should normally be used for design where frost depth is relevant.","trigger":null,"approval_gate":null,"exception_condition":null,"condition_provenance":"source_explicit","normalization_provenance":"text_only"},"lifecycle":{"primary_phase":"design","primary_phase_label":"Design","applicable_phases":["design"],"phase_links":[{"phase":"design","provenance":"jddg_cross_section_explicit","basis":"Linked to separate JDDG Section 14.8 design evidence/submittal requirements.","phase_label":"Design"}]},"responsibility":{"primary_workflow_owner":"ACT-DESIGNER-AE","primary_workflow_owner_name":"Designer / A-E","actor_assignment_status":"workflow_only","actors":[{"actor_id":"ACT-DESIGNER-AE","actor_name":"Designer / A-E","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"design","lifecycle_phase_label":"Design","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."}]},"verification":{"method":"external_standard_compliance_review","stage":["design"],"acceptance_criteria":null,"evidence_required":["external_standard_compliance_evidence"],"verification_provenance":"external_standard_required","evidence_provenance":"external_standard_required","audit_status":"needs_external_standard_for_full_acceptance","audit_confidence":"high","acceptance_provenance":"external_standard_required","evidence_type_ids":["EV-DESIGN-ANALYSIS-FINAL"],"supporting_source_requirements":["JDDG25-14.8.4.3-R01"],"source_support_scope":"design_submittal_or_analysis"},"resolved_evidence":[{"evidence_type_id":"EV-DESIGN-ANALYSIS-FINAL","name":"Final Design Analysis compliance verification","source_requirement_ids":["JDDG25-14.8.4.3-R01"],"stage":["final_design"],"source_scope":"Final Design Analysis should support and verify design compliance with project requirements."}],"supporting_source_requirements":[{"requirement_id":"JDDG25-14.8.4.3-R01","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"Final design analysis should support and verify that the design complies with project requirements."}],"references_resolved":[{"source_reference_text":"UFC 3-301-01","reference_id":"EXT-UFC-3-301-01","scope":"external","reference_type":"UFC","document_number":"UFC 3-301-01","locator":null,"dependency_type":"external_content_required_for_full_evaluation","title":null,"chapter_criteria_listed":false,"quality_flags":[],"external_content_status":"not_ingested"}]}