{"requirement_id":"JDDG25-14.6.4-R02","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.6.4","title":"FROST DEPTH","page_printed":235,"page_pdf":265,"fact":"Approved local frost depths or values established by standard commercial practice may be substituted for the UFC values.","modality":"may","strength":"conditional_permission"},"localization_ja":{"language":"ja","title_ja":"凍結深度","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"条件を満たす場合は～してよい","strength_label_ja":"条件付き許可","translation_priority":"medium","translation_notes":[],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":[],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"normal"},"applicability":{"applicability_class":"conditional_text","evaluation_mode":"human_review","evaluation_scope":"project","input_semantics":"human_review","source_condition_text":"Approved local frost depths or values established by standard commercial practice may be substituted for the UFC values.","trigger":null,"approval_gate":null,"exception_condition":null,"condition_provenance":"source_explicit","normalization_provenance":"text_only"},"lifecycle":{"primary_phase":"design","primary_phase_label":"Design","applicable_phases":["design"],"phase_links":[{"phase":"design","provenance":"jddg_cross_section_explicit","basis":"Linked to separate JDDG Section 14.8 design evidence/submittal requirements.","phase_label":"Design"}]},"responsibility":{"primary_workflow_owner":"ACT-DESIGNER-AE","primary_workflow_owner_name":"Designer / A-E","actor_assignment_status":"workflow_only","actors":[{"actor_id":"ACT-DESIGNER-AE","actor_name":"Designer / A-E","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"design","lifecycle_phase_label":"Design","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."}]},"verification":{"method":"coordination_or_approval_review","stage":["design"],"acceptance_criteria":"Japan District approval required if decreased depth >25%","evidence_required":["coordination_or_approval_record"],"verification_provenance":"source_implied","evidence_provenance":"jddg_cross_section_explicit","audit_status":"source_action_with_derived_evidence","audit_confidence":"medium","acceptance_provenance":"source_explicit","evidence_type_ids":["EV-DESIGN-ANALYSIS-FINAL"],"supporting_source_requirements":["JDDG25-14.8.4.3-R01"],"source_support_scope":"design_submittal_or_analysis"},"resolved_evidence":[{"evidence_type_id":"EV-DESIGN-ANALYSIS-FINAL","name":"Final Design Analysis compliance verification","source_requirement_ids":["JDDG25-14.8.4.3-R01"],"stage":["final_design"],"source_scope":"Final Design Analysis should support and verify design compliance with project requirements."}],"supporting_source_requirements":[{"requirement_id":"JDDG25-14.8.4.3-R01","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"Final design analysis should support and verify that the design complies with project requirements."}],"references_resolved":[]}