{"requirement_id":"JDDG25-14.9.10-R02","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.9.10","title":"ARC FFLASH ANALYSIS","page_printed":248,"page_pdf":278,"fact":"Arc-flash labels are to be provided as required by UFC 3-560-01 or installation requirements.","modality":"imperative","strength":"conditional_mandatory"},"localization_ja":{"language":"ja","title_ja":"アークフラッシュ解析","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"条件を満たす場合は～すること","strength_label_ja":"条件付き必須","translation_priority":"high","translation_notes":["原文タイトルの “FFLASH” はそのままCanonical側に保持し、日本語表示は「アークフラッシュ解析」とする。"],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":["UFC 3-560-01"],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"normal"},"applicability":{"applicability_class":"conditional_machine","evaluation_mode":"machine","evaluation_scope":"project","input_semantics":"external_or_installation_determination","source_condition_text":"Arc-flash labels are to be provided as required by UFC 3-560-01 or installation requirements.","trigger":{"field":"external_determinations.ufc_or_installation_arc_flash_labels_required","op":"is_true"},"approval_gate":null,"exception_condition":null,"condition_provenance":"source_explicit","normalization_provenance":"editorial_normalization"},"lifecycle":{"primary_phase":"design","primary_phase_label":"Design","applicable_phases":["design","installation"],"phase_links":[{"phase":"design","provenance":"jddg_cross_section_explicit","basis":"Linked to separate JDDG Section 14.8 design evidence/submittal requirements.","phase_label":"Design"},{"phase":"installation","provenance":"source_implied","basis":"Source requirement concerns installed configuration or physical construction.","phase_label":"Installation / Construction"}]},"responsibility":{"primary_workflow_owner":"ACT-DESIGNER-AE","primary_workflow_owner_name":"Designer / A-E","actor_assignment_status":"workflow_only","actors":[{"actor_id":"ACT-DESIGNER-AE","actor_name":"Designer / A-E","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"design","lifecycle_phase_label":"Design","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."},{"actor_id":"ACT-CONSTRUCTION-CONTRACTOR","actor_name":"Construction Contractor","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"installation","lifecycle_phase_label":"Installation / Construction","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."}]},"verification":{"method":"label_inspection","stage":["installation"],"acceptance_criteria":null,"evidence_required":["arc_flash_labels"],"verification_provenance":"editorial_derived","evidence_provenance":"jddg_cross_section_explicit","audit_status":"derived_check_method_not_stated_by_source","audit_confidence":"medium","acceptance_provenance":"not_stated_in_jddg","evidence_type_ids":["EV-DESIGN-ANALYSIS-FINAL"],"supporting_source_requirements":["JDDG25-14.8.4.3-R01"],"source_support_scope":"design_submittal_or_analysis"},"resolved_evidence":[{"evidence_type_id":"EV-DESIGN-ANALYSIS-FINAL","name":"Final Design Analysis compliance verification","source_requirement_ids":["JDDG25-14.8.4.3-R01"],"stage":["final_design"],"source_scope":"Final Design Analysis should support and verify design compliance with project requirements."}],"supporting_source_requirements":[{"requirement_id":"JDDG25-14.8.4.3-R01","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"Final design analysis should support and verify that the design complies with project requirements."}],"references_resolved":[{"source_reference_text":"UFC 3-560-01","reference_id":"EXT-UFC-3-560-01","scope":"external","reference_type":"UFC","document_number":"UFC 3-560-01","locator":null,"dependency_type":"supporting_or_compliance_reference","title":"Electrical Safety, O&M","chapter_criteria_listed":true,"quality_flags":[],"external_content_status":"not_ingested"}]}