{"requirement_id":"JDDG25-14.9.8-R05","source":{"document":"Japan District Design Guide","version":"9.0","publication_date":"2025-04","chapter":"14","section":"14.9.8","title":"INTERRUPTING RATINGS","page_printed":247,"page_pdf":277,"fact":"Japanese series/cascade-rated panelboards are acceptable when the breaker combination is tested and marked in accordance with NEC 240.86(B).","modality":"acceptable_if","strength":"conditional_permission"},"localization_ja":{"language":"ja","title_ja":"遮断定格","title_status":"controlled_editorial","fact_ja":null,"fact_translation_status":"pending","modality_rendering_ja":"～の場合は許容される","strength_label_ja":"条件付き許可","translation_priority":"medium","translation_notes":[],"title_translation_provenance":"editorial_controlled","fact_translation_provenance":"not_translated","publication_eligible":false},"references":["NEC 240.86(B)"],"meaning":{"engineering_basis":null,"engineering_basis_source":null,"engineering_interpretation":null,"interpretation_confidence":null},"risk":{"failure_modes":[],"failure_mode_source":"not_stated","failure_domains":[]},"quality":{"source_status":"normal","data_quality_flag":"normal"},"applicability":{"applicability_class":"conditional_text","evaluation_mode":"human_review","evaluation_scope":"project","input_semantics":"human_review","source_condition_text":"the breaker combination is tested and marked in accordance with NEC 240","trigger":null,"approval_gate":null,"exception_condition":null,"condition_provenance":"source_explicit","normalization_provenance":"text_only"},"lifecycle":{"primary_phase":"commissioning","primary_phase_label":"Testing / Commissioning / Acceptance","applicable_phases":["design","commissioning"],"phase_links":[{"phase":"design","provenance":"jddg_cross_section_explicit","basis":"Linked to separate JDDG Section 14.8 design evidence/submittal requirements.","phase_label":"Design"},{"phase":"commissioning","provenance":"source_explicit","basis":"Normalized from verification stage `commissioning`.","phase_label":"Testing / Commissioning / Acceptance"}]},"responsibility":{"primary_workflow_owner":"ACT-DESIGNER-AE","primary_workflow_owner_name":"Designer / A-E","actor_assignment_status":"workflow_only","actors":[{"actor_id":"ACT-DESIGNER-AE","actor_name":"Designer / A-E","actor_class":"project_delivery","source_named":true,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"design","lifecycle_phase_label":"Design","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."},{"actor_id":"ACT-WORKFLOW-VERIFICATION-PARTY","actor_name":"Verification / Testing Party (Workflow Placeholder)","actor_class":"workflow_placeholder","source_named":false,"relation_type":"workflow_owner","provenance":"editorial_derived","lifecycle_phase":"commissioning","lifecycle_phase_label":"Testing / Commissioning / Acceptance","basis":"Workflow owner assigned from lifecycle phase for checklist routing; not a contractual responsibility statement."}]},"verification":{"method":"test_record_review","stage":["commissioning"],"acceptance_criteria":null,"evidence_required":["test_report"],"verification_provenance":"source_explicit","evidence_provenance":"source_explicit_or_directly_named","audit_status":"source_explicit_verification","audit_confidence":"high","acceptance_provenance":"not_stated_in_jddg","evidence_type_ids":["EV-DESIGN-ANALYSIS-FINAL","EV-SHORT-CIRCUIT-ANALYSIS","EV-INTERMEDIATE-ONE-LINE","EV-FINAL-CALCULATIONS"],"supporting_source_requirements":["JDDG25-14.8.4.3-R01","JDDG25-14.8.3.3-R02","JDDG25-14.8.3.1-R06","JDDG25-14.8.4.3-R02"],"source_support_scope":"design_submittal_or_analysis"},"resolved_evidence":[{"evidence_type_id":"EV-DESIGN-ANALYSIS-FINAL","name":"Final Design Analysis compliance verification","source_requirement_ids":["JDDG25-14.8.4.3-R01"],"stage":["final_design"],"source_scope":"Final Design Analysis should support and verify design compliance with project requirements."},{"evidence_type_id":"EV-SHORT-CIRCUIT-ANALYSIS","name":"Short-circuit analysis","source_requirement_ids":["JDDG25-14.8.3.3-R02"],"stage":["intermediate_design"],"source_scope":"Intermediate calculations include short-circuit analysis."},{"evidence_type_id":"EV-INTERMEDIATE-ONE-LINE","name":"Intermediate one-line / riser diagram","source_requirement_ids":["JDDG25-14.8.3.1-R06"],"stage":["intermediate_design"],"source_scope":"One-line/riser diagrams show conduit/conductor sizes, panels, breaker frame/trip values, and short-circuit ratings."},{"evidence_type_id":"EV-FINAL-CALCULATIONS","name":"Final engineering calculations","source_requirement_ids":["JDDG25-14.8.4.3-R02"],"stage":["final_design"],"source_scope":"All final calculations are included in the Final Design Analysis."}],"supporting_source_requirements":[{"requirement_id":"JDDG25-14.8.4.3-R01","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"Final design analysis should support and verify that the design complies with project requirements."},{"requirement_id":"JDDG25-14.8.3.3-R02","section":"14.8.3.3","title":"DESIGN ANALYSIS","fact":"Intermediate design calculations should include short-circuit analysis."},{"requirement_id":"JDDG25-14.8.3.1-R06","section":"14.8.3.1","title":"DRAWINGS","fact":"Intermediate one-line/riser diagrams are to show conduit and conductor sizes, panels, breaker frame sizes, trip amps, and short-circuit ratings."},{"requirement_id":"JDDG25-14.8.4.3-R02","section":"14.8.4.3","title":"DESIGN ANALYSIS","fact":"All final calculations are to be included in the Final Design Analysis."}],"references_resolved":[{"source_reference_text":"NEC 240.86(B)","reference_id":"EXT-NFPA-70-NEC","scope":"external","reference_type":"code","document_number":"NFPA 70 / NEC","locator":"240.86(B)","dependency_type":"supporting_or_compliance_reference","title":"National Electrical Code","chapter_criteria_listed":true,"quality_flags":[],"external_content_status":"not_ingested"}]}